Why one board instead of several documents?
A product launch usually touches engineering, marketing, sales and support at once, and each team is used to its own tool: a roadmap tool for engineering, a content calendar for marketing, a spreadsheet for sales enablement. The problem is that a launch depends on all of them staying in sync, and nobody has a single place to see whether they actually are. One board that every team can see solves the coordination problem a launch plan exists for in the first place: not "what is my team doing" but "are we all going to be ready on the same day."
How to structure the board
1. One column or area per workstream
Give engineering, marketing, sales and support each their own column (or a clearly separated area if you're not using a strict kanban layout). This keeps each team's work legible to its own members while staying visible to everyone else.
2. A dated card for every task, with an owner
Every task that needs to happen before launch gets its own card, with a due date and a named owner. Vague cards like "finish website" get missed; specific cards like "publish pricing page copy, owner: Priya, due 12 Nov" get done. A small progress bar on bigger tasks (like "beta testing," which isn't a single action) shows how far along it is without anyone having to ask.
3. Connect dependencies explicitly
If marketing can't finalise the launch email until the final feature list is locked, draw a line between those two cards with a label like "blocks." This is the single highest-value habit in launch planning: it turns "I didn't know that was blocked on us" into something visible on the board before it becomes a problem.
4. A shared timeline view
Lay cards out left to right by date, or use a dedicated timeline area, so anyone can tell at a glance whether the plan is on track just by how full the board looks closer to the launch date. A board that's still mostly empty two weeks out is a visible warning sign nobody has to say out loud.
5. A separate launch-day checklist
Keep a short, separate checklist card (or a small board nested inside the main one) for the actual day: publish the post, send the email, flip the flag, notify support, post on social. This list should be short enough to run through in order on the day itself, distinct from the weeks of planning that got you there.
A simple structure to copy
| Column | Example cards |
|---|---|
| Engineering | Feature complete, QA pass, feature flag ready |
| Marketing | Landing page live, launch email drafted, social assets ready |
| Sales | Pricing finalised, sales deck updated, team briefed |
| Support | Help docs written, support team briefed, FAQ published |
| Launch day | Publish post, send email, flip flag, announce on social |
Doing this in Kolam
Kolam's project plan template starts you with columns and to-do cards ready to rename for your own workstreams. Due dates and progress bars live on the cards themselves, lines with labels show dependencies directly on the board, and because it's one shared board, engineering, marketing and sales see the same timeline update the moment anyone changes it, with live presence showing who's editing. Comments with @mentions keep discussion attached to the specific task it's about instead of scattered across chat threads.
For the final checklist, nest a small board inside the launch date's card so the day-of list stays separate and short, but one click away from the full plan. See project planning for more on how teams structure bigger plans, or open the project plan template and set up your own launch this way.
Frequently asked questions
How far in advance should I start planning a launch?
For a meaningful product launch, 6 to 10 weeks is common: enough time for marketing assets, a beta or review period, and sales or support training, without the plan going stale before it's used. Smaller launches can compress to 2 to 3 weeks.
Should engineering and marketing use the same board?
Yes, if you want dependencies to be visible. If engineering slips a date, marketing needs to see it immediately, not three days later in a different tool. Separate boards per team usually recreate the coordination problem a launch plan is meant to solve.
What belongs on a launch-day checklist?
The final, time-sensitive actions: publish the blog post, send the announcement email, flip the feature flag, post on social, notify support. Keep it separate from the weeks-long planning board so launch day itself has a short, clear list, not the whole project.
How do you handle a launch date slipping?
Move the date on the board itself and let connected tasks visibly shift with it, rather than updating several separate documents. If dependencies are drawn as lines on the board, everyone downstream sees the change in the same place they already look.